"The Quality will remain long after the price is forgotten." Frederick Henry Royce (of Rolls-Royce)
Don't forget the percentage assigned to the
specific panel styles. .
|
||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
VOLUME
PANEL PRICE TABLE (
6 or more) |
||||
|---|---|---|---|---|
3' ht from grade |
4' ht from grade |
5' ht from grade |
6' ht from Grade |
|
36" Net Width |
$300 |
$350 |
$400 |
$450 |
6o" Net Width |
$450 |
$500 |
$550 |
$600 |
Don't forget the percentage assigned to the specific
styles.
|
||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
VOLUME
PRICE TABLE ( 6 or MORE ) |
|
2' Net Height |
|
36" Net Width |
$380 |
6o" Net Width |
$540 |
![]() |
![]() |
| Note: All commissions include, upon receipt of advance payment, a posting of statements, drawings, site photos (when applicable) and any data that might simplify communications. This site is available normally withinone week of payment and remains active for the duration of the project. Upon receipt of an email linking you to your site, it is necessary to review and confirm the data before work can begin. | ![]() |
Production Centers |
|||
Oregon |
California |
Illinois |
N. Carolina |
*An important note regardimng your
posts. Below is a link to an example post setting. It
will make the difference between a post with an 8-year life and a post
with a 30-year life. When investing in the CPW fencelines, don't
allow an improperly set post to be your weakest link. Insist your
installer follow this method for posts that are to be set into the grade.
Other methods, such as above-grade brackets and threaded rod are acceptable
as well.
|
|
|---|
|
|
![]() |
| 1) A typical wood gate within the Continental United States ships FedEx freight. 2) If you order an item, we will provide a quote, where necessary, for standard shipping. The independent courier may have an additional charge for redelivery and making appointments. We will not be responsible for any of these charges. 3) When items are shipped motor freight, the items become the property of the purchaser when they leave our dock. Motor freight companies may have strict policies regarding damaged freight. If you sign for a damaged package without noting the damage at the time of the delivery, they will often not allow the claim. If you detect some damage to the crate, please make a note of this on the Bill of Lading the driver will ask you to sign. You do not need to refuse delivery or ask the driver to wait. Your signed note will be sufficient in the event of a claim.4) Please make sure you understand the shipping options and how your order will ship before placing an order. Relax. We use durable, ribbed crates. As of summer 2003, only one shipment has arrived with damage. This, in June 2003, involved a small break on a single rail of a single panel and CPW replaced it without question. The fault was ours. |
|