CUSTOM WOOD ARCHING ARBOR #11

#11
Base Price + 18%
Table #2
(3-½ or 5-½” posts
)

CUSTOM WOOD ARBOR #11

Garden Arbor #11 as a 4-post assembly. Ships fully assembled, with mounting caps in place. Designed to be lifted and set onto the site posts and secured in place. Requiring less than an hour.
The mounting caps are mortised to create a pocket for the posts–in the event the posts are not cut perfectly square. The weight of the below example, at 40″ between posts, is about 75 lbs.

arts and crafts wood garden arbor #11. Prowell woodworks

CUSTOM WOOD GARDEN ARBOR #11

Mill Valley, CA

Shown as a 2-post application, with Garden Gate #214.
For 2-post applications, it’s best to employ the prowell corbels

unique gate #214f in marin county, CA

CUSTOM WOOD GARDEN ARBOR #11

arts and crafts wood arbor pergola #11. prowell

CUSTOM WOOD GARDEN ARBOR #11

Mill Valley, CA

Not sure what our homeowner has in mind here, other than over the decades we’ve learned how certain commissions are simply the result of a not-to-be-denied yearning. A work of art installed front-and-center, visible to everyone. custom wood garden gate #214e in Mill Valley, CA

CUSTOM WOOD GARDEN ARBOR #11

arts and crafts wood arbor pergola #11. prowell

CUSTOM WOOD GARDEN ARBOR #11

Unique wood gate #214c in Marin County, Cailifornia

CUSTOM WOOD GARDEN ARBOR #11

craftsman wood arbors and pergolas #11. prowell woodworks

IN-PROGRESS

GARDEN ARBOR #11–PROGRESS

Spans and stress loads are at the heart of architecture. The structural engineer’s education requires mounds of math and the comparative properties of the materials in use. This all goes into the stratagem of any resulting architectural design. What we have with Arbor #11 is the maturing results of Arbor #3. Coupling dual beams with wenge thru-tenons to create a beam that is significantly rigid over greater spans.

in-progress shop of arbor #21aa. prowell woodworks

GARDEN ARBOR #11–PROGRESS

In-Progress shop techniques of arbor #21bb.

GARDEN ARBOR #11–PROGRESS

Using a series of scrapers, the wenge tenons of any glue residue. Better than working a piece of sandpaper in a tight area.

In-Ptogress shop of arbor #21cc. prowell woodworks.

GARDEN ARBOR #11–PROGRESS

In=Progress shop of arbor #21dd. prowell woodworks

GARDEN ARBOR #11–PROGRESS

lthough the shop has since been equipped with an industrial heater and AC, for several years we made do during the winter cold spells with the use of simple electric blankets to enhance the glue set-up time. Set to a timer of two hours. during the wet and cold winters, the set-up time for glues is shortened by using a simple electric blanket set to a timer of two hours.

building the wood arbor #21ee. Joinery

GARDEN ARBOR #11–PROGRESS

Mock posts are set to insure the dimensions between posts match the customer’s specifications.

Woodworking shop techniques for building wood arbor #21ff. prowell

wood fence
The Designs of Prowell Woodworks are protected by Patents and Patents Pending.

abstract separator
Gallery #1 Garden Gates
Gallery #1A Garden Gates
Gallery #1B Garden Gates
Gallery #1C Garden Gates
Gallery #200 Series Garden Gates Plus
Gallery #2 Driveway Gates
Gallery #3 Fences
Gallery #4 Arbors
Gallery #5 Columns
Gallery #6 Benches/Swings
Gates Pricing
Fences Pricing
Driveway Gates Pricing
Columns Pricing